A metro tunnel technician looks on as APS technicians work on a TBM head.

Metro Tunnel TBM Rigging

APS crane and rigging services team have been providing support for our client CYP, assisting in dismantling and reassembling the tunnel boring machines (TBM’S) that are drilling connecting tunnels for Melbourne’s Metro Tunnel mega project.

Working around the clock on the project, the 125+ man team have delivered with safety excellence and efficiency always in mind. APS is proud to have been a major part of this massive infrastructure project, which is estimated to cost nearly $14 Billion.

Contact Us

Capability Statement

APS Overall Capabilities
PDF 2.6 MB