Our Suspended Access Platform system was used by a Tier 1 construction provider to carry out the bridge inspections, remediation, repair, and maintenance services for the NSW Major Bridge. This included access platforms on both the above-ground and overwater sections of the bridge.
The APS design and manufacturing teams worked closely with the client to ensure each of our modular decking systems was optimised to the bridge project needs. APS arranged initial transport and logistics as well as the delivery, erection, relocation, lowering and dismantling of the platforms.