Melbourne Connect.

Melbourne Connect

The project required APS’s scaffold and engineering teams to design, engineer, and erect a bridging scaffold over an existing void, eliminating the need for a ground-based birdcage scaffold to access the underside of the structures.

The design was built with a 5kPa deck to allow construction works underneath to continue whilst simultaneous scaffold works were happing above, providing a saving for the client on labour and scaffold materials.