Scaffolding lining the wall of a construction site.

Metro Tunnel Early Works

Our scaffolding scope included theĀ design, engineering, supply and installation of four, forty metres hung scaffolds.

Design, engineering, and scaffold specialists were also required for the construction of various scaffolds throughout the early works of the Melbourne Metro Tunnel project.

This covered a range of sites, requiring APS to provide a critical 24hr round clock scaffold support service.

Contact Us

Capability Statement

APS Overall Capability
PDF 2.6 MB